Allansmith Retaining Wall:
This project included the design of a 40 foot long retaining wall adjacent to the flood plane of the San Lorenzo River, and the realignment of a Santa Cruz County storm drain through the wall.
A department of Fish and Game Permit was required for the discharge into the San Lorenzo River. RI Engineering provided project coordination, construction document preparations and permitting support for the work.
Client: Andrew Allansmith - Owner
|